Multi Layers Fabric Expansion Joint

Product Details
Customization: Available
Connection: Flange
Kind: Corrugated Compensator
Still deciding? Get samples of US$ 100/Piece
Request Sample
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
3
Year of Establishment
2015-08-11
  • Multi Layers Fabric Expansion Joint
  • Multi Layers Fabric Expansion Joint
  • Multi Layers Fabric Expansion Joint
  • Multi Layers Fabric Expansion Joint
  • Multi Layers Fabric Expansion Joint
  • Multi Layers Fabric Expansion Joint
Find Similar Products

Basic Info.

Model NO.
FEJ
Type
Axial
Head Code
Square
Material
Fabric
Surface Treatment
Epoxy
Customized
Customized
Warranty
24 Months
Application
Chemical
Color
Customized
Shape
Circular, Rectangular
Design Pressure
0psi~14.5psi
Operating Temperature
-4 F~+2282 F
Product Name
Multi Layers Fabric Expansion Joint
Transport Package
Plywooden Case
Specification
1" - 48"
Trademark
Fly
Origin
Zhejiang Province, China
HS Code
7307990000
Production Capacity
50000tons/Month

Product Description

Multi layers Fabric Expansion Joint
Flange ends fabric rectangle expansion joint

The rectangular non-metallic compensator is a flexible component consisting of a composite non-metal mateiral,two pipes (or flanges) connected to adjacent pipeline and insulation materials.It is mainly used to compensate for the displacement caused by temperature, mechanical vibration, and foundation sinking in pipelines and equipment systems that transport micro-pressure dust gas, smoke, gas, and other gases.Pressure range:≤0.05 Mpa;Temperature range: low temperature type ≤200°C, high temperature type ≤ 800°C; Diameter range:Any sizes.

Multi Layers Fabric Expansion Joint

NO  ITEMS  MATERIALS  NO  ITEMS  MATERIALS 
1 Long connection tube Carbon steel Filler Carbon steel
2 Ring plate Carbon steel 8 Steel wire  SS304
3&4 Screw bolt/Nut Carbon steel 9 Inner sleeve SS304/Carbon steel
5 Gasket Carbon steel 10 Press plate Carbon steel
6 Astragal Rubber composite 11 Short connection tube Carbon steel

Technique Parameter
 Low Temperature Rectangular Fabric Expansion Joint
Design Pressure P=0.049Mpa Design Temperature T=200ºC

Pipeline Sectional Area      Axial
  Compensation
   Effective
   Area
   Flange    Total
  Length
     Max.
    Width
       Axial Lateral    cm² Height Size mm mm
0.8 < aXb ≤ 2.5 40 8    (a+20)(b+20) 100 28 400 a+400
80 11 500
120 15 600
2.5 < aXb ≤ 4.0    40 5 (a+20)(b+20) 100 28 400 a+400
80 8 500
120 11 600
4.0 < aXb ≤ 6.0 40 4 (a+30)(b+30) 100 36 500 a+500
80 6 600
120 8 700
6.0 < aXb ≤ 9.0 40 3 (a+30)(b+30) 100 36 500 a+500

Low Temperature Rectangular Fabric Expansion Joint
Design Pressure P=0.049Mpa Design Temperature T=800ºC

Pipeline Sectional Area     Axial
  Compensation
 Effective
 Area
   Flange  Total
 Length
  Max.
 Width
       Axial   Lateral    cm² Height Size mm mm
0.8 < aXb ≤ 2.5 40 8    (a+40)(b+40) 100 28 400 a+600
80 10 500
120 12 600
2.5 < aXb ≤ 4.0   40 5 (a+40)(b+40) 100 28 400 a+600
80 8 500
120 10 600
4.0 < aXb ≤ 6.0 40 4 (a+50)(b+50) 100 36 500 a+700
80 6 600
120 8 700
6.0 < aXb ≤ 9.0 40 3 (a+50)(b+50) 100 36 500 a+700
80 4 600
120 5 700

Fabric Rectangular Expansion Joint Application 
Gas turbine exhaust pipeline
• Desulfurization system 
• Flue gas duct and exhaust system for kinds of industries  
• Coal fired boiler, circulating fluidized bed boiler and exhaust-heat boiler for flue gas duct  

Factory Corner

Multi Layers Fabric Expansion Joint

FAQ
Q. Are you a trading company or a manufacturer?
A: We are a manufacturer as you can see our workshop as above.

Q. What is your payment term?
A:Normally T/T 30% in advance, balance to be paid before delivery.

Q: What is your main market?
A:North America,Greenland,South America,Africa,Southeast Assia, Former Soviet Republics ,East Assia,and Europe.
Q: Can I place sample order to your factory?
A: Yes, Samples can be provided.

Q:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.

Q: How long is your delivery time?
A: Generally it is 5-7 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is accordijng to quantity.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier